National Repository of Grey Literature 36 records found  1 - 10nextend  jump to record: Search took 0.00 seconds. 
Department store - Building Technology Project
Bláhová, Barbora ; Ing.Václav Čech (referee) ; Henková, Svatava (advisor)
The thesis is focused on building technology solutions for the construction department store. The front of the main entrance, designed for base personnel has two floors; the rest designed for the sale is single-storey. The building is designed as a reinforced concrete skeleton hall. Roofing is solved by a flat roof consisting of sales of reinforced concrete beams with a slope of 3 %, with the roofing sheet ALKORPLAN. The two-storey part of the roof is again dealt with a flat roof, consisting of ceiling panels and concrete catchment slope of 2 %, the roofing sheet ALKORPLAN. External walls are designed sandwich panels KINGSPAN. Walls and ceilings are dealt with plasterboard. The floors are made of linoleum and ceramic tiles. The building is equipped with aluminum windows, interior doors are made of wood. Outdoor and entrance doors are made from aluminum. This thesis addresses the implementation of technology, organization of construction, time demands, costs to implement the object, control over the implementation – KZP, coordination situation, and instructions for use of the building after its handover to the owner.
Realization of envelope of production and storage hall EBM in Velké Poříčí
Mlčáková, Markéta ; Diaz, Yvetta (referee) ; Novotný, Michal (advisor)
My bachelor thesis is focused on the stage of sheathing of an industrial and production ebm hall in Velké Poříčí near Náchod. The stage is focused on sheathing with Bond cassettes and Rockprofil cassette system including trapezoidal metal sheets. The work consists of the concomitant and summary technical report, solution of the site construction equipment, solution of factory routes, technological regulation, report of acreage, time schedule, control and test plan, work safety and layout scheme of sheathing.
Construction and technological project of the telescopic covers hall - HESTEGO a.s.
Sigmund, Martin ; Venkrbec, Václav (referee) ; Novotný, Michal (advisor)
The content of this thesis titled "Construction and technological project of the telescopic covers hall" is building - technological solution of building together with technical, time, financial, safety, qualitative, fire and legislative solutions of selected building.
Construction Technology Project of the extension of the Medical Faculty in Prague
Januška, Marek ; Novotný, Michal (referee) ; Venkrbec, Václav (advisor)
The goal of this diploma thesis is the processing of the building-technological project for Health University in Prague. For the thesis there was elaborated a technic report, situation of the construction place, object time schdule and financial plan, the study of the implementation of technologist. Stages, project of construction site equipment, design of mechanical assembly, technological regulation for the implementation of monolithic vertical and horizontal load-bearing structures together with inspection and test plan. Furthermore, the thesis contains a schedule of the main building, a plan for securing material resources and a financial analysis of the formwork. The basis for preparation thesis is the project documentation of the construction.
Implementation of Superstructure of Apartment Building in Havirov
Kolmačka, Ondřej ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
This bachelor's thesis deals with the elaboration of a technological project for the stage of rough superstructure of an apartment building in Havířov. The vertical construction system of the apartment building is made of sand-lime blocks. The horizontal construction system consists of monolithic reinforced concrete structures. The content of this bachelor's thesis is the elaboration of a technical report on a construction technology project, the situation of construction with closer transport relationships, construction supply design, item budget for selected technological processes, technological regulation for vertical structures - masonry, construction organization for a given technological stage, including equipment drawing. construction site, time schedule for the technological stage, balance of resources, technological analysis, design of machinery for the technological stage, quality requirements and their provision in the implementation of vertical load-bearing structures – masonry and occupational safety of the solved technological stage. Furthermore, the calculation of the construction according to technical and economic indicators, the accompanying and summary technical report and diagrams.
Completion of chateau Návojná – Multi - functional building, implementation of finishing processes
Vaněk, Josef ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
The content of the thesis is the solution the technological stages of finishing works new multifunctional building in the village Návojná. The work focuses on the implementation of floor construction and contact thermal insulation system. The work includes a technical report, technological situation, the organization of the construction, plan work safety and time schedule. Further technological regulations of selected construction processes, inspection and test plan, inventory of machines, bill of quantities and selected details of construction solutions.
Technological stage of realization structure of polyfunfcion building
Liška, Aleš ; Ing.Jitka Vlčková (referee) ; Diaz, Yvetta (advisor)
The object of the bachelor thesis is technological stage of realization structure of polyfunfcion building in Velesin. The thesis deals with facility of the building site, project of machines, technological rules, plan of quality controls, timetable, item budget and work safety.
Essens Administrative Center in Brno - Líšeň, Structural Upper Construction
Martincová, Michaela ; Řihák, Pavel (referee) ; Šlanhof, Jiří (advisor)
This bachelor thesis deals with the technological stage of the rough top of the administrative building of essens in brno-líšni. It focuses on the assembly of the supporting structure from the prefabricated parts and the implementation of monolithic supporting structures inside the building. The work includes the technical report, the situation of wider transport routes, the statement of the design, the time schedule, the design of the machine assembly, the two technological regulations, the organization of the construction, the budget item, the control and test plans and the work safety.
Preparation of realisation gross superstructure of an apartment block named Francouzská in Brno
Křenková, Kristýna ; Mohapl,, Martin (referee) ; Šlanhof, Jiří (advisor)
This bachelor thesis deals with construction technology procedure gross superstructure of an apartment block named Francouzská in Brno. An apartment block has 7 floors. First floor is located partially below ground, becouse lobby area is located in very steep terrain towards the Francouská street. Wing unit is made up of mainly enclosure wall, interior transverse and longitudinal walls of the ceramic blocks Porotherm. Transverse and longitudinal supporting interior walls are produced of sheathing bricks Supertherm, which are located in 1.NP, 2.NP and partially in 3.NP, these blocks are sealed with concrete. Ceilings are designed as continuous strengthened concrete-steel monolithic desks. The staircase is designed as a monolithic reinforced concrete. This construction and technological study of gross superstructure includes technical report, technologic process of concrete-steel monolithic ceiling, plan routes, inspection and test plan, schedule, financial requirements, solution the organization of building up, assembly and machine safety.
Perovna Kunvald, implementation of carcass superstructure
Madarászová, Daniela ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
The main subject of Bachelor thesis two technological steps carcass superstructure factory springs in Kunvald, as Kunvaldská The building consists of two parts: manufactory and administrative part. Bulding is out of town and will be used year-round. It is a basement building, factory building is on one floor and an office building on two. Construction of factory building is made up of steel I-beams sheathed wall panels Kingspan, office building consists of ceramic bricks Porotherm. Processing stages of technological addresses cladding on the shop floor wall panels Kingspan and the creation of an office building roofs. The flat roof of the office building consists of two parts walkable and nowalkable , will be made to both technological prescription.

National Repository of Grey Literature : 36 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.